I have to make a full project estimation off of the plans using rsmeans for costs of materials and fill out excel sheets. more details will be in the files below.
Please read/check the attachment below. Architectural History I, 2024Final Assignment (30% of total Grade)Due: Submit as PDFThe
Please read/check the attachment below. Architectural History I, 2024 Final Assignment (30% of total Grade) Due: Submit as PDF The assignment is graded out of 20 total points across 4 questions (5pts per question). The assignment is weighted as 3. For each question below the expectation is for a 350-400